Friday, 8 December 2017

Shooting Schedule


Location
Equipment
Props/costume
Cast/crew
Transport
Length
Date
House
-Camera
-Tripod
-Guitar
-Mobile phone
Anya and Sarah
-Car (Sarah)
3 hours
11:00
23/10/17
House
-Camera
-Tripod
-Mobile phone
Anya and Sarah
-Walking (Sarah)
2 hours
11:30
26/10/17
UEA Lake
-Camera
-Tripod
-Mobile phone
Anya and Sarah
-Car (Anya)
-Bus (Sarah)
2 hours
13:00
18/11/17
Drama classroom (for performance)
-Camera
-Tripod
-Guitar
Anya and Sarah
-Walking (Anya and Sarah)
30 minutes
13:25
13/12/17
Drama classroom (for performance)
-Camera
-Tripod
-Guitar
Anya and Sarah
-Walking (Anya and Sarah)
30 minutes
13:25
14/12/17
Drama classroom (for performance)
-Camera
-Tripod
-Guitar
Anya and Sarah
-Walking (Anya and Sarah)
30 minutes
13:25
15/12/17
UEA Lake
-Camera
-Tripod
-Mobile phone
Anya and Sarah
-Car (Anya and Sarah)
2 hour
13:00
16/12/17

To increase the efficiency of our production, we made a shooting schedule. This was very helpful for our planning because it ensured that we knew exactly where and when we would be filming, plus what equipment we would need. We decided to film most of our music video's narrative in chronological order, beginning with the shots in the character's bedroom, before filming outside; this was to make it easier to consider continuity. Next we will film the performance part of our video which will be included in our video with crosscutting.

No comments:

Post a Comment